Thursday, June 25, 2015

Dream Team 3: Stories from Line 2


Dream Team 3 composed of Hannah, a PhD student from Baylor University, and John, a soon-to-be PhD student at Texas A&M.



We started our journey at a heart-wrenching 5am to flag all 94 points along our line. It was my first time in the east coast and I was as prepared as I could be for the humid 95+ degree heat of the day. On this first day, we traveled some North Carolina back country roads, encountered strange bugs and controlled field burns.











Our section was composed of endless corn, and wheat fields, with several tobacco fields on our ride back to the instrument center. We managed to flag all 94 points and be back to the instrument center by 3pm; well before any other team showed up.


The next day, the first deployment day, John and I managed to install 60 stations, leaving us with 34 to complete the next day. John took the task of digging all 60 holes where the instruments would live for several days to record the impending explosive charges. 










I was in charge of GPS point taking, bookkeeping and driving. The following day we left not quite as early to deploy our remaining 34 instruments. I took charge of digging the remaining holes on our line and driving, while John did bookkeeping. We finished our section early, well before 11am, and decided to aid a fellow team by deploying 11 of their sensors. That night was the night of the explosive charges. John and I decided to tag along to experience two of the explosions.









We left our hotel at 11pm and did not get back until 5:30am, where we had four hours of sleep before returning to the instruments for retrieval. I did all the retrieval digging and John took charge of the GPS marking and bookkeeping. 

The author of this post, happily posing with a Texan


We had one instrument wind up missing, but with no other surprises for the day. On the second retrieval day, we had several instruments dug up with bags ripped open. All together we successfully deployed 105 instruments and recovered 104. Now for a much needed semi-day-off before starting the same process on line one! 

(Post by Hannah Mejia)

Tuesday, June 23, 2015

Cougar tracks?


While deploying the seismic equipment in the beautiful swamps of North Carolina, fellow ENAMers Hannah Marks and I stumbled upon an interesting set of animal tracks. 

Cougar or bear? Whatever it is, there are some long teeth on the other end of those tracks, so better be careful...
A self-proclaimed amateur track specialist, I described the tracks as “ The freshest pair of cougar tracks in North Carolina, and proof the big cats are alive and well in North Carolina!” though his assumption hasn’t been verified by outside professionals.  The eastern cougar, which used to prowl openly as recently as 1930 in North Carolina has now been declared extinct just last week by the U.S. Fish and Wildlife Commission [1], but local reports due come out from time to time stating their survival [2]!
           
So the real question is: Are these fresh tracks of the thought to be extinct Eastern Cougar or some other humongous feline?

P.S. A follow up inspection (in the next couple of days) by Hannah and I will help to shed more light on this interesting find!
 
References:

(Post by Casey Brokaw)

Program, deploy, shoot, pick up, download, repeat.

For the next three weeks the experiment pace is going to be a planned sequence of events with very little wiggle room (although two contingency days are built in the schedule). In essence our schedule consists of five fundamental steps repeated for each profile: 1) seismometer programming, 2) instrument deployment, 3) shooting, 4) instrument pick up, 5) data download.
Like clockwork, everything seems easy when coordination and collaboration of all the people in the science team is efficient and these steps follow each other seamlessly. So far we are on schedule and everything is going well.

1) Seismometer programming

The instruments (RefTek 125 a.k.a. "the Texans") are cable-less single-channel dataloggers that can be deployed for three to five days, recording continuously.
Casey holding a "Texan"
Before we can start working with the instruments, we need to power them. So we sat down and loaded each of the 720 of them with 2 D-cell alkaline batteries.

Loading batteries in the 720 Texans. Now we can start testing/programming the instruments.
The recording parameters (window length, sample rate, etc) are programmed before the Texans are deployed through "bridges" that allow to work on multiple instruments at the same time.

One of the PASSCAL bridges used to program, download and connect with the RT125 Texans seismometers. Each bridge (hub) can simultaneously connect with 15 instruments. We have 15 bridges, so during operations we could program/download 225 instruments simultaneously.
Laptops ready to program the instruments that will go in the ground

Bridget working on 45 instruments. Note the bridge inserted on the back side of the box. These instruments are getting ready to be deployed.
2) Instrument deployment

The ENAM land active-source experiment will acquire data along two profiles, Line 1 (to the north) and Line 2 (to the south). We will start deploying and recording Line 2, which has 705 stations. The seismometers along this profile will be deployed by 8 teams, each consisting of 2 people (a driver and a navigator), armed with seismometers, sensors, GPS, shovel, authorized permits, electric tape, deployment/recovering sheets, leveling bubbles, flags, cleaning rags, plastic bags, cutters, bug spray, gallons of drinking water and a bucket of resilience.

Deployers kits
Before the teams head out to the field, Bridget and Eric have been training them on how to correctly deploy the seismic instruments.
Bridget and Eric, showing how to correctly deploy an RT125
 Each team will deploy ~ 85 instruments over a time window of 2 days. All instruments will have to be in the ground by June 22, 11:00PM, when the first land shot will be fired.
Hannah, Ryan and Casey pondering how it will feel doing this 85 times (or more!) in a 105F weather.
After all details are explained and questions answered, the teams head out to the field to survey their stations. This will be their opportunity to familiarize with their section of the profile, select the location for each station and flag it and enter it in the handheld GPS, so that the following day (deployment day) there will be no need to spend time making decisions about the locations and time can be efficiently spent deploying the instruments.

On deployment day, everybody gets a pretty early start. Teams show up at the instrument center around 5AM to pick up a bit over half of their instruments (in the blue boxes - each box contains 15 Texans), and the head out to the field. Dan, Bridget, Eric and I head out to the instrument center around 4:45AM to make sure they get all they need to do their job and see them off. By 7:30AM all teams have loaded and are off to their tasks.

Seismometers and sensors divided up by deployment team ready to be picked up

Deployment teams arrive at the instrument center to load at the crack of dawn.


More loading

Siwen and James checking equipment before loading it in their vehicles
One last load to go!
The last station went into the ground in the evening of June 22. That same night we will shoot 6 points along Line 2. Shooting will start at 11PM if all goes well, and will take most of the night. More on that tomorrow morning!

Monday, June 22, 2015

Adventures in the field from a "field minion's" perspective :)


Hello!  My name is Ashley Nauer and I am a Master’s student studying geophysics with a concentration in seismology.  I am one of three graduate students from The University of Texas at El Paso (UTEP) working on the Seismic Source Team for the ENAM project.  The other two students on the team are Felix Ziwu and Afshin Gholamy, both doctoral candidates who also study geophysics.  

UTEP graduate field assistants Ashley Nauer (MS student), Afshin Gholamy (PhD student) and Felix Ziwu (PhD student) at dinner before their first workday in the field.
We drove with our mentor, Galen Kaip, a special research associate also from UTEP in “The Beast” from El Paso, Texas to our final destination in Dunn, North Carolina with our equipment in tow on Thursday, June 4, 2015.  In case you are wondering, the traveling distance of the trip is about 1,811 miles according to Google.  After driving for 2 days and meeting up with Dr. Harder in Georgia to pick-up the main “ingredients” of our supplies, i.e. the explosive materials, we drove the last stretch to Dunn where we settled in our 3rd hotel-home.  We are about to move into our 7th hotel-home and it is crazy to think that we have driven through 7 states, 5 to get to where the profile lines are located and 2 to get to the 11 shot holes spread out on the profile lines.   

Filling the cartridges with emulsion.
Placing the filled cartridges carefully back in to the magazines for transport. Inserted photo to the right shows what it looks like inside the magazine.
Home away from home in various hotels for the next few weeks.

We spent Sunday, June 6, 2015 scouting our first 2 shot holes to make sure that the dirt roads in the areas were in good driving conditions for our vehicles as well as for the drillers, who we met the next day.  Most if not all the shot holes are located on private and/or farming land. 

Got wheat?
One of the many dirt roads we drove on to get to the shot holes.


On a typical field day, we would wake up at 6 or 6:30 am, eat breakfast and head out to our first shot hole at about 7:30 am.  Our team would split where Galen would leave with Felix to pick up gravel needed to stem the hole, while Dr. Harder, Afshin and I would leave to pick up the emulsion, boosters, detonators and bags of bentonite needed for the shot hole we were working on that day.  We would eventually meet at the shot hole location and wait for the drillers to finish drilling.  Some holes would take about an hour or 2 to drill, while others would take longer depending on the geologic conditions.  As soon as the driller drilled to a depth of about 60 feet, we would prepare the charges.  After the charges were placed in the hole, we would stem the hole or fill it.  Each charge is about 5 feet in length and the holes are about 70 feet deep.  That means, Afshin, Felix, Galen and I would have to fill the space above the charges in the ground that is about 60 feet by shoveling gravel and sand in to buckets and pouring them into the hole.  It sounds easier said than done, but if you consider our working conditions, you would see that it is hard manual work.  Not only do we drive 30+ miles each day transporting materials to the shot hole, we lift over 200 lb. of different materials working in hot, humid weather out in the field during the summer in the South.  Need I say more? 

Drilling one of the shot holes.
The drillers clearing their equipment, so we could start stemming the hole with gravel.

The dump truck filled with gravel. It would not be a real fieldwork experience without a vehicle getting stuck, now would it?


However, at the end of the day it is all worth it.  Not only to help with the project, but for us students, to learn and observe all we can and putting what we learn in the classroom into action.  Thanks to the hard work, dedication and efforts of the project’s chief scientists and funding received from various sources, we students are fortunate to be here.  

(Post by Ashley Nauer)


Sunday, June 21, 2015

Shot point operations along the ENAM profiles


The 1440 seismometers and sensors deployed along the two ENAM profiles will record seismic waves produced by 11 detonations located along the trace of the profiles. To ensure that most of the energy will travel in the subsurface rather than being lost at the surface, the explosives are detonated at a depth of about 70 feet. Each shot point location is carefully selected to match strict safety requirements and then permitted with state and local authorities. Once permits are authorized, drilling of the boreholes and loading of the explosives can begin. The seismic source team has been working ahead of the deployment team to prep all the shot points along the two lines.

Near surface geology along most of the ENAM lines consists of unconsolidated sands and plastic clays.  These require mud rotary drilling techniques and some method to hold the borehole open (i.e., casing) so the liquid explosive (called emulsion) is not squeezed from the hole.  In the ENAM project we case only the explosive, a much more economical method than casing the entire borehole.  The white tubes in the photo below are filled with emulsion and have been primed with detonators (orange wires) and boosters (inside the tubes).  They are ready to be loaded into the hole.

Two charges ready for loading into the borehole. Charges contain 200 lb. each of emulsion and are 5 feet long and 10 inches in diameter.

A charge being lifted by the drill before loading into the borehole. Note the two large piles of sand produced from drilling the borehole.
 (by Steve Harder and Beatrice Magnani)

Friday, June 19, 2015

Yay Texans!

Carrying out a seismic experiment requires many talents. One of them is patience. After traveling all day on Wednesday, the volunteers sat around most of the day waiting for the equipment to arrive at the instrument center. The delivery was scheduled for 4:30PM, so we took the opportunity to get a good safety and general briefing from Dan, learn few things about the logistics of the ENAM experiment, the scientific goals of the project, and the geology of the region.

Dan briefing the volunteers ahead of a day of deployment


A few people were less patient than others and snuck out of the room after the first two hours (two hours!!) and took the opportunity to show off their new truck.

Steve showing off his new truck used for carrying explosives to shot points

Perhaps this is a good time to clarify that Dan, Hannah and I were preceded in North Carolina and Virginia by the UTEP seismic source team, composed by Steve Harder, Galen Kaip, Ashley Nauer, Afshin Gholamy and Felix Ziwu. The source team task has been to drill and load the explosives at the shot points ahead of us along both seismic lines, and they have been doing so for the past month (more on the drilling and shot point loading in another post).

Explosive science!
After HOURS of continental rifting conundrums, the welcome sound of an eighteen-wheeler maneuvering in the back loading dock of the center gets our attention (and gains us our freedom!)

The instruments arrive.
The equipment has finally arrived, signaling the start of the clock of our experiment. From now on our schedule is locked in and our days will be spent flagging stations, deploying instruments and recovering them along the two profiles. Wish us luck!

This is what shipping 720 RT125 (a.k.a "Texans") instruments and seismic paraphernalia looks like.

Finally some action! unloading the pallets and moving boxes to the lab

More box moving

Finally getting the gist of it

Is that a blimp? and other tales from driving the lines


Heading south from Elizabeth City, down past the Coast Guard base and around the airport, we wound past fields and fancy waterfront houses until a bunch of blimps appeared on the right, parked next to what must have been a blimp hangar. We had to stop on the side of the road for a photo­­­­­–the sheer ridiculousness of these giant marshmallow-like things just sitting on the ground was too good of an opportunity to pass up. I guess they have to park them somewhere when they’re not circling above football games decked out with Goodyear banners, but the blimp field was definitely one of the more surprising things we saw as we drove along Line 1 last Sunday morning.

Photo courtesy of Dan Lizarralde

Dan and I drove Line 2 on Friday and Saturday, and most of Line 1 on Sunday, as a final sanity check on the drive tracks and station locations for deployment. There’s only so much that can be done by going over routes in Google Earth, and the best way to make sure that dirt tracks exist and are drivable, and that stations aren’t set to be deployed on private property decked out with ‘No Trespassing’ signs, is to drive the lines in advance.

Driving the lines takes a lot of time, but it’s a pretty straightforward operation–until you’re trying to find a turn onto a track that doesn’t actually exist, or a swarm of horseflies dive-bombs the car right when you have to get out to open a locked gate, or you venture past a posted warning to ask if you can set out instruments and a guy on a tractor politely warns you that there’s a biohazard risk if you go near his barns full of turkeys.

Aside from incidents like those, though, which were few and far between, both lines checked out alright. Corrected drive tracks have been loaded into GPS units along with waypoints for the station locations; everything is ready for the deployment teams to flag, and then deploy, some 700 stations along Line 2 starting tomorrow (Saturday). Many of the teams will have long drives along the line, with detours around swamps and rivers, but most of it’s along quiet roads past pleasant scenery, and when we do Line 1, one lucky team out past Elizabeth City will be treated to a close-up view of a bunch of blimps on the side of the road. I wonder what blimp-related noise would look like on a seismogram…if we see any strange signals on those few stations at least we’ll know what they came from.

(by Hannah Mark)